Roof trusses & wall frames, built to your plans.
Frame-X manufactures prefabricated timber roof trusses, wall frames and Posi-Strut floor systems in Dandenong South, and supplies structural steel with your frame package, for builders across Melbourne and Victoria.
fabricator
Your whole frame package from one set of plans
Every component is detailed against your drawings in MiTek software, checked, then cut in our Dandenong South factory.
Roof Trusses
Engineered timber trusses for gable, hip and raked roofs, residential and commercial.
View roof trusses
Wall Frames
Factory-built timber wall frames, numbered and delivered ready to stand.
View wall frames
Posi-Struts
Open-web floor and roof trusses with room to run services through the joists.
View Posi-Struts
Structural Steel
Lintels, PFCs, beams and T-bars, supplied with your frame and truss package.
View structural steelFrom plans to site, with a timeline you can plan around
- 01
Send your plans
Upload architectural and engineering drawings, or email them to sales@framex.com.au.
- 02
Get your quote
An itemised quote usually comes back in 2–4 business days.
- 03
Detailing & engineering
Layouts are detailed and reviewed in about 1–2 weeks, then sent to you to approve.
- 04
Manufacture & delivery
Built and dispatched to site in about 2–4 weeks after layouts are approved.
Local manufacturer. Straight answers. Frames that fit.
- One supplier for the full package
Roof trusses, wall frames, Posi-Struts and steel, all detailed from the one set of plans.
- Checked against your drawings
Every component is detailed to your project, not adjusted from a generic template, and checked before it is cut.
- Certified, treated structural pine
Sourced from certified plantations and treated for durability and termite resistance.
- One contact from quote to delivery
You talk to the same team through drafting and manufacturing, so your schedule is never left guessing.
How long does a quote take?
Most quotes are back in 2–4 business days once we have your architectural and engineering plans.
What is the lead time once I order?
Detailing and engineering review takes about 1–2 weeks. Manufacturing and dispatch follow in about 2–4 weeks after you approve the layouts.
Where do you deliver?
We deliver from Dandenong South to sites across Melbourne and regional Victoria.
What do I need to send for a quote?
Your architectural drawings and engineering plans. Upload them through the quote form or email sales@framex.com.au.
Send us your plans. We’ll quote in 2–4 business days.
Get your free quote
Upload your PDF plans, tick the products you need and we’ll come back with an itemised quote in 2–4 business days.
- Roof trusses, wall frames, Posi-Struts and steel from one set of plans
- Every component checked against your drawings
- Free measure & quote, no obligation